MZG Industrial Wide Wire Shelving Garage Heavy Duty High Capacity Metal Wire Storage Shelves Unit Rack with Wheels

Product Description

Space Storage Solutions
Storage and Organization System

Trusted by 10+ Million Families Worldwide

  • The only publicly listed company in the storage and organization industry
  • Serving Customers Across 100+ Countries & Regions
  • 28 years of industry leadership since 1998 in Space Storage Solutions
Smart Factory and Manufacturing

Smart Factory, 35-45 Days Production Time

  • 1,000+ employees and 800+ containers monthly capacity ensure reliable global supply.
  • Four integrated centers streamline R&D, production, logistics, and manufacturing for maximum efficiency.
  • China's Largest Surface Treatment Facility with Comprehensive Certifications.
Advanced Production Facilities
Strict Quality Control Testing

The Most Complete and Strict Quality Control System in the Industry

  • Meet Japan & US quality standards
  • Pass 3rd party quality testing
  • Pass factory audit from Walmart, NITORI, LOWES ETC
Premium Carbon Steel Materials

Premium-Grade Carbon Steel for Superior Performance

  • 3-Month Fresh Steel from Listed Enterprises, No Re-melted Steel
  • 30% Higher Strength Than Market Alternatives
  • High-Density Carbon Steel for Superior Strength & Durability
Comprehensive Shelving Range

The Industry's Most Comprehensive Shelving System

  • Multiple Tube Diameter Options for Diverse Applications
  • Industry-leading Surface Treatment Technology, Superior Finish & Protection
  • Heavy-Duty Load Capacity, Rock-Solid Stability
Heavy Duty Load Capacity Display
Shelving System Structure
Shelving System Installation
Frequently Asked Questions
What is the standard production lead time?
The standard production turnaround time is between 35 to 45 days, enabled by our smart factory setup and dedicated multi-center workflow.
What quality standards and certifications do your products meet?
Our products strictly adhere to Japan and US quality criteria, pass third-party inspection processes, and meet international audit standards from retailers like Walmart, NITORI, and LOWES.
What materials are used in the shelving systems?
We use premium-grade, 3-month fresh carbon steel sourced from listed enterprises. We never use re-melted steel, ensuring up to 30% higher strength than common market alternatives.
What is your monthly manufacturing capacity?
Backed by a team of over 1,000 employees and four integrated production hubs, our monthly capacity exceeds 800 shipping containers to ensure reliable supply globally.
Can these shelving systems handle heavy-duty applications?
Yes. With multiple tube diameter options, high-density carbon steel, and advanced surface finishing, our shelving is built specifically for heavy-duty load capacities and long-lasting stability.

Related Products