Jracking Industrial Warehouse Rack Steel Heavy-Duty Cantilever Racking System for Car Storage

Product Description

Cantilever Racking Banner
Product Showcase
Name Cantilever Racking Material Q235B Steel
Size Customized Size Color Customized Color
Depth Customized Weight Capacity 1000kg/arm
Width Customized Height Customized
Finish Powder coating; Hot Dip Galvanized
Packing Export Package
Certification RMI / CE / ISO / TUV / AS4084-2012
MOQ One 20ft / 40ft Container
Free Sample Available (Delivery Cost on Buyer)
OEM Available
Racking Structure
Component Detail
Cantilever Arm Installation
Technical Specifications
Installation Step 1
1

Connect 1 row of MK bracing brackets at the inside of columns positioned at ends, meanwhile connect 2 rows of brackets at both sides of columns in intermediate, as shown.

Installation Step 2
2

Position the column (1) vertically. Position the column (1) into the fixing MK base, as shown. Connect the column and the base with M20x40 bolts (7). Fastening the other M20x40 bolts (7) on the base. Recommended torque: 86~103N.M

Installation Step 3
3

The standard composition of the vertical bracing, after it has been fastened to the columns, is as shown in the illustration.

Installation Step 4
4

The bases must be leveled with metal leveling plates if necessary. Then, fully tighten the M20x40 bolts(7) on the base front as indicated in step 2. Using the drill-holes in the bases for fastening them to the floor use a Ø14 bit and drill a hole with a minimum depth of 100 mm. Remove the drilling remains and carefully hammer in the fastening M10x160 anchors(11). Firmly bolt the fastening plate in place. Recommended torque: 50 MN

Installation Step 5
5

The arm (12) is fastened to the column(1) using safety pins Ø29x140(13). Fit the arms (11) according to the heights and distribution shown on the corresponding project drawing, where applicable.

Installation Step 6
6

Finally, the completed structure should look like the illustration.

Factory Overview
Production Process
Quality Inspection
Certificates
Packaging and Shipping
Warehouse Project
Global Distribution
Product Range
Frequently Asked Questions
What are your trading terms and lead times?

Payment terms include T/T 30% deposit upon order confirmation and 70% balance paid against the bill of lading, with L/C and O/A also available. The standard lead time is normally 20-25 days after deposit receipt. Shipping ports are Shanghai and Nanjing, China. Samples are available for each model within 7-15 days.

How can my goods be delivered?

Goods can be delivered via sea freight, which is updated based on your destination port. Alternatively, delivery can be arranged through a designated client shipping agent once contact details are provided.

What customer services and engineering support do you offer?

Inquiries are replied to within 12 hours by fluent English-speaking staff. We provide full OEM & ODM solutions, with experienced professional engineers available to design tailored customized racking solutions.

What is the standard order and purchasing process?

The process follows these steps: Design drawing → Confirm drawing → Quotation → Proforma Invoice (PI) → Confirm PI → Arrange 30% deposit → Manufacture → QC inspection → Pay balance → Shipping.

What competitive advantages and warranties do you offer?

We offer flexible O/A 40-60 day payment options, fast delivery for urgent orders, and direct-factory competitive pricing. All products come with a two-year warranty with free replacement of damaged components.

Is there a minimum order quantity (MOQ) and how are tooling fees handled?

There is no strict MOQ limitation, but volume orders provide better pricing; an order size fitting at least one 20ft container (~15 tons) is recommended. When customized mold tooling is required, upfront tooling fees are charged and partially or fully refunded once order quantities reach specified milestones.

Related Products